A plus for Biberach
Sana Kliniken established a high level of patient care in the district of Biberach with the new hospital building on the health campus at Hauderboschen. The central hospital, which will go into operation in September 2021, will ensure comprehensive and safe care close to home.
An essential aspect of the new concept is the networking of the individual wards, departments and areas. The resulting short distances with their functioning orientation increase the comfort of the patients and create efficient work processes. The time savings that result for everyone involved ultimately benefit the patients. The newly constructed building is the centre of the health campus and unique in the region. The external guidance system, which is standardised for all facilities on the site, makes a significant contribution to optimal networking.
After being commissioned by the general contractor VAMED (Belin), the interior signage was implemented using the quintessenz signage system based on the planning of the CICI office (Ravensburg). The overview boards, signposts and door signs from meng, which are easy to update on site, fit perfectly into the modern clinic building with their proportions and CI-compliant colour scheme.
After completion of the roads and paths, the outdoor signage was planned by meng under the direction of the district of Biberach. In order to create a uniform overall impression, the partly illuminated exterior columns were also chosen from the quintessenz system, analogous to the interior signage.In addition, large logo signs on the façades create a long-distance effect for the main access roads. The custom-made illuminated banner above the main entrance of the clinic gives visitors clear orientation after leaving the car park or bus stop.